How Mobilis carried out electric foundation work with an undersized grid connection

Mobilis is building a water treatment plant in Beuningen, fully electrically, with ultra-low emissions on site. The bottleneck: the grid connection did not provide enough capacity for the heavy electric equipment.

The CleanStar 250 provided the solution: 250 kW of continuous power, no nitrogen deposition, and enough energy to keep the construction site running autonomously for two weeks. This kept the project on schedule, without relying on the grid.